Monday, 18 March 2019

Gurgaon: Held up by petrol pump, IFFCO Chowk underpass opens

It was conceptualised as part of the traffic improvement work at three major junctions in Gurgaon — Signature Tower junction, IFFCO Chowk, and Rajiv Chowk. However, even as the structures at the other intersections had been opened to traffic, work on the IFFCO Chowk underpass had been held up because of a petrol pump that fell along its alignment, with the Haryana Shahari Vikas Pradhikaran (HSVP) and the owner of the establishment struggling to reach a consensus regarding a new site for the pump. A site had finally been allotted and the pump was removed on February 5, following which the site was handed over and construction resumed. Don't Miss Vivek Oberoi dons different looks for PM Narendra Modi biopic Goa political scenario: Talks between BJP, allies continue to be in deadlock Dailyhunthttp://profile.hatena.ne.jp/koramenschep/

https://www.plurk.com/peddapeelee

No comments:

Post a Comment